Dutch masters of steel since 1667
EN
Dutch Masters of Steel since 1667
/

Rabobank

About this project

MHB has manufactured, glazed and assembled approximately 60 internal screens in the SL30® profile series for this bank office. Various requirements have been set for the various internal glazed screens and doors, such as a number with a fire resistance of 60 minutes, a number of soundproofing and throughfall-proofing. All these specifications can be applied in this narrow profile serie. The bank building from the 1980s did not meet the spatial and building physics requirements that the bank set for the building. The new office environment had to be a representation of the bank's vision: sustainable, flexible, transparent and multifunctional. The special thing about this project is that, as the architect calls it, ear muffs have been placed against the existing building. The old building is therefore closed in the new building.
Architect:

Van den Pauwert Architecten BV, Eindhoven

Location:

Geldrop

Photography:

buro PAM

Contractor:

Aannemersbedrijf Houta BV, Geldrop

Used systems:

SL30


Steel glazed walls in the Rabobank office building in Geldrop the Netherlands
MBS-R Locking system for doors with hallway in the rabobank office building, Geldrop, the Netherlands